Contingency Analysis (Line Outage & Generator Outage)

What is the primary goal of contingency analysis in power systems?
In power system contingency analysis, what does N-1 contingency refer to?
When a generator outage occurs, how is the lost generation typically managed?
Which is not true when a transmission line outage occurs?
Which of the following can be an effect of a generator outage?